Working with Environmental Engineering UK, Thomas Halliwell carried out the electrical installation at KP Snacks' new production site in Hellaby, Yorkshire.
The scope covered high-level containment and sub-main cabling, distribution boards, 110V transformers, machine power supplies and metering. Everything was tailored to the hygiene and throughput demands of food manufacturing.
- High-level containment
- Sub-main cabling
- Distribution boards
- 110V transformers
- Machine power supplies
- Metering
“I'm extremely proud of our team's capability to deliver high-quality electrical installations within a tight timeframe while minimising disruption to our clients' business.”




