Food Production · Hellaby, South Yorkshire

KP Snacks

Full electrical installation at KP Snacks' brand-new Hellaby production site.

KP Snacks, Hellaby, South Yorkshire
KP Snacks, Hellaby, South Yorkshire

Working with Environmental Engineering UK, Thomas Halliwell carried out the electrical installation at KP Snacks' new production site in Hellaby, Yorkshire.

The scope covered high-level containment and sub-main cabling, distribution boards, 110V transformers, machine power supplies and metering. Everything was tailored to the hygiene and throughput demands of food manufacturing.

Scope of works
  • High-level containment
  • Sub-main cabling
  • Distribution boards
  • 110V transformers
  • Machine power supplies
  • Metering

“I'm extremely proud of our team's capability to deliver high-quality electrical installations within a tight timeframe while minimising disruption to our clients' business.”

Director — Thomas Halliwell
Project gallery · 4 photos

Start a project

Need support with a project like this?

Tell us what you're planning. We'll come back within one working day with the right engineer for the job.

Concept design · not the official website